Street section detail - Useful indications:
- The excavation is indemnified according to the theoretical calculation. The costs relating to the formwork: greater excavation, intermediate transport, material recovery and filling are to be included in the unit price; - The protection of the embankment and the safety systems of the excavation pits are indemnified with the relative positions;
- The minimum width of 60 cm must always be guaranteed between the slope and the outermost part of the formwork;
- The excavation works are in any case to be carried out in compliance with the Ordinance on the safety and health protection of workers in construction works.
 
Recommended CAD blocks

Road curb with safety barrier

DWG

Road cross section with cut and fill

DWG

Visibility in the roundabout

DWG

Elastomer bitumen transition joint

DWG

Joint with rubber insert

DWG

Rigid transition joint

DWG
  • DOWNLOADS MODE
  • Free
    for all
  • Free
    for Archweb Users
  • Subscription
    for premium users
  • SINGLE PURCHASE
    pay 1 and download 1
Download
0.33MB
Description
Scale 1:100
Details
Share
Recommended CAD blocks

Road curb with safety barrier

DWG

Road cross section with cut and fill

DWG

Visibility in the roundabout

DWG

Elastomer bitumen transition joint

DWG

Joint with rubber insert

DWG

Rigid transition joint

DWG