Scheme of implantation of a flight of steps with cuttings on artificial ridges. The structure is carried out simultaneously with the formation of the various layers of the embankment, putting a bed of cuttings covered by the material of the next layer on the upper part of each layer. The branches must protrude from the ground for about 25 cm. With this system, in addition to the greening of the structure, a considerable increase in stability due to the draining and consolidating action of the plants.
 
Recommended CAD blocks

Embankment defence 01

DWG

Stabilizing works 07 - Live cribwall

DWG

Embankment defence with branches

DWG

Stabilizing works 09 - Terraced steps

DWG

Stabilizing works 02 - brush layering

DWG

Double-walled live piles

DWG
  • DOWNLOADS MODE
  • Free
    for all
  • Free
    for Archweb Users
  • Subscription
    for premium users
  • SINGLE PURCHASE
    pay 1 and download 1
Download
0.56MB
Description
Scale 1:100
 
Details
Share
Recommended CAD blocks

Embankment defence 01

DWG

Stabilizing works 07 - Live cribwall

DWG

Embankment defence with branches

DWG

Stabilizing works 09 - Terraced steps

DWG

Stabilizing works 02 - brush layering

DWG

Double-walled live piles

DWG