Example of stabilizing work using the piling and planting technique. Comb accommodation in lumber is necessary to hold back the larger material haulage. The plants will be chosen according to the surrounding vegetation in order to give the work a perfect environmental insertion.
         
Recommended CAD blocks

Stabilizing works 08 - Terraced steps

DWG

Naturalization of the watercourse

DWG

Embankment naturalization

DWG

Stabilizing works 05 - Wattle and daub

DWG

Dirt road sections 01

DWG

Riverbed section 01

DWG
  • DOWNLOADS MODE
  • Free
    for all
  • Free
    for Archweb Users
  • Subscription
    for premium users
  • SINGLE PURCHASE
    pay 1 and download 1
Download
0.25MB
Description
Scale 1:100
Details
Share
Recommended CAD blocks

Stabilizing works 08 - Terraced steps

DWG

Naturalization of the watercourse

DWG

Embankment naturalization

DWG

Stabilizing works 05 - Wattle and daub

DWG

Dirt road sections 01

DWG

Riverbed section 01

DWG