Registered

Stabilizing works 03 – Fascinate

Scale 1:100
 

Planting of a live fascine on Fascines composed of 5-6 rods of pioneer species (willows or other types) are placed horizontally on the bottom of the excavation, about 30-50 cm deep and buried with the excavated material from the next bank. The distance between successive rows varies from 1,5 to 2 m. The fascines are fixed to the ground with wooden stakes (green or dead) inserted between the branches or placed immediately downstream from them.
 

Recommended CAD Blocks

Bank defense 02

DWG

Stabilizing Works 10 – Steps

DWG

Double-walled live palisade

DWG

Erosion Protection – Branch Repellent Layers

DWG

Live timber grates

DWG

Stabilizing works 07 – Pilings

DWG

Stabilizing works 14 – Steps

DWG

Stabilization works 15

DWG

How does the download work?

To download files from the Archweb.com site there are 4 types of download, identified by 4 different colors. Discover the subscriptions

Free
for all

Free
for Archweb users

Subscription
for Premium users

Single purchase
pay 1 and download 1