Registered

Stabilizing works 03 – brush layering

Scale 1:100
 

Implantation of a live fascinate on Fagots composed of 5-6 pioneer rods (willows or other types) are placed horizontally on the bottom of the excavation, about 30-50 cm deep and buried with the excavation material of the following quay. The distance between successive rows varies from 1.5 to 2 m. The bundles are fixed to the ground with wooden stakes (green or dead) inserted between the branches or placed immediately downstream of them.
 

no longer available

Recommended CAD blocks

Stabilizing works 08 – Terraced steps

DWG

Stabilizing works 04 – Live palisades

DWG

Piling 01

DWG

Channel section 01

DWG

Riverbed section 02

DWG

Stabilizing works 02 – brush layering

DWG

Dirt road sections 01

DWG

Embankment naturalization

DWG

How the download works?

To download files from Archweb.com there are 4 types of downloads, identified by 4 different colors. Discover the subscriptions

Free
for all

Free
for Archweb users

Subscription
for Premium users

Single purchase
pay 1 and download 1