Registered

Stabilizing works 03 – brush layering

Scale 1:100
 

Implantation of a live fascinate on Fagots composed of 5-6 pioneer rods (willows or other types) are placed horizontally on the bottom of the excavation, about 30-50 cm deep and buried with the excavation material of the following quay. The distance between successive rows varies from 1.5 to 2 m. The bundles are fixed to the ground with wooden stakes (green or dead) inserted between the branches or placed immediately downstream of them.
 

Recommended CAD blocks

Stabilizing works 02 – brush layering

DWG

Embankment defence with branches

DWG

Channel section 01

DWG

Embankment naturalization

DWG

Stabilizing works 08 – Terraced steps

DWG

Stabilizing works 04 – Live palisades

DWG

Stabilizing works 03 – brush layering

DWG

Piling 01

DWG

How the download works?

To download files from Archweb.com there are 4 types of downloads, identified by 4 different colors. Discover the subscriptions

Free
for all

Free
for Archweb users

Subscription
for Premium users

Single purchase
pay 1 and download 1